This contract includes the following elements: 1.Sewerage network Construction of sewerage network in approximate length of 9.2 km. 2. Water supply priority measures Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. 3. Wastewater Treatment Plant Design and Construction …
The indicative scope of works covers the following elements: 1. Sewerage network: - Phase I: Construction of the main collector, pumping station for transfer of collected wastewater from the urban area and connections of II and III phase. - Phases II and III: Construction of wastewater network with total length …
This contract includes the following elements: 1. Sewerage network Construction of sewerage network in the approximate length of 9.2 km. 2. Water supply priority measures Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. 3. Wastewater Treatment Plant Design …
The contract includes the following elements: 1.Sewerage network: Phase I: Construction of the main collector, pumping station for transfer of collected wastewater from the urban area and connections of II and III phase. Phases II and III: Construction of wastewater network with total length of L=13,793 m. 2. Wastewater Treatment …
The indicative scope of works covers the following elements: - Section 1: Construction of sewerage network, separation of wastewater and storm water network in the city centre and construction of new network, which will serve to 2500 inhabitants. - Section 2: Rehabilitation of wastewater treatment plant Rehabilitated and upgraded WWTP …
Indicative scope of works on the project “Wastewater management system improvement in the Municipality of Mojkovac” includes the following elements: - Section 1: Construction of sewerage network, separation of wastewater and storm water network in the city centre and construction of new network, which will serve to 2500 inhabitants. - …
This contract includes the design and construction of: - the Wastewater Treatment Plant - connection to the water supply system - connection to the power supply system The Contractor is required to design WWTP for the final capacity of 30,000 p.e. (Phase II capacity). The preliminary treatment facilities and the …