Your search for Particle accelerators
Number of alerts found: 14

Hydroformed bellows for Super FRS

The DN400CF hydroformed bellows assemblies of the Super-FRS beamline are designed to operate at room temperature under an ultimate pressure below 10?7 mbar. These hydroformed bellows assemblies function as flexible and adaptable connections between adjacent vacuum components, ensuring vacuum integrity while accommodating mechanical tolerances and thermal expansion. A total of …

CPV: 31643000 Particle accelerators, 42000000 Industrial machinery, 42123000 Compressors
Deadline:
April 24, 2025, noon
Deadline type:
Submitting a bid
Place of execution:
Hydroformed bellows for Super FRS
Awarding body:
FAIR - Facility for Antiproton and Ion Research in Europe GmbH
Award number:
32/2600025686FAIR
Publication:
March 26, 2025, 12:32 a.m.
FAIR Planning, Specification Development, and Supervision of Assembly Services in the SFRS

In the target area (Building L0516A.E10) of the Super Fragment Separator of the new particle accelerator at the FAIR facility, nine different assembly units (vacuum chamber, magnets, beam catchers) need to be installed. These assembly units are currently still in production, pre-assembly, or stored in GSI halls. Some of the …

CPV: 31643000 Particle accelerators
Place of execution:
FAIR Planning, Specification Development, and Supervision of Assembly Services in the SFRS
Awarding body:
FAIR - Facility for Antiproton and Ion Research in Europe GmbH
Award number:
01/2600025802_FAIR
Publication:
March 22, 2025, 2:51 a.m.
Fabricación, instalación y test necesarios de la Cave del instrumento MIRACLES.

La Cave será instalada en el puerto W5 de la European Spallation Source (ESS) en Lund (Suecia). La Cave será instalada en el puerto W5 de la European Spallation Source (ESS) en Lund (Suecia).

CPV: 31643000 Particle accelerators, 14622000 Steel
Deadline:
April 28, 2025, 7 p.m.
Deadline type:
Submitting a bid
Place of execution:
Fabricación, instalación y test necesarios de la Cave del instrumento MIRACLES.
Awarding body:
Comisión Ejecutiva del Consorcio ESS Bilbao
Award number:
420/24
Publication:
March 19, 2025, 3:13 a.m.
Beam Current Monitors (BCMs) voor MYRRHA Phase I (MINERVA) 100 MeV proton LINAC

Het onderwerp van deze aanbesteding is de levering van Beam Current Monitors (BCM's). Het BCM-systeemontwerp van MINERVA vereist het gebruik van wisselstroomtransformatoren (ACCT). Om een acceptabele prestatie van het voorgedigitaliseerde signaal over de hele uitleesketen te garanderen, betreft deze aanbesteding daarom de levering van de ACCT's samen met de benodigde …

CPV: 31643000 Particle accelerators, 31643100 Linear accelerators, 38400000 Instruments for checking physical characteristics, 38410000 Metering instruments
Place of execution:
Beam Current Monitors (BCMs) voor MYRRHA Phase I (MINERVA) 100 MeV proton LINAC
Awarding body:
SCK•CEN
Award number:
2024-141-JVL
Publication:
March 15, 2025, 3:19 a.m.