Neubau Sport- und Bewegungshalle - Rohbauarbeiten Erdarbeiten, Aushub und Entsorgung ca. 3.625 m3; Gründung WU-Beton ca. 590 m3 + FBV-Folie, ca. 2.216 m2; Ortbeton Wände und Decken, ca. 2.025 m2; Betonfertigteile Wandplatten und Stützen, unterschiedl. Abmessungen, ca. 95 St.; Mauerwerk, ca. 210 m2; Putzarbeiten ca. 705 m2; Holzbauarbeiten, 6 St. …
Design, Build and Maintenance of a full size World Rugby Accredited Rugby Turf Surface synthetic pitch for Boyne RFC at their proposed Grounds in Shamrock Lodge, Drogheda, Co. Louth. Design, Build and Maintenance of a full size World Rugby Accredited Rugby Turf Surface synthetic pitch for Boyne RFC at their …
Stage 1 tender process (Suitability Assessment Questionnaire) for works contractors to form a framework agreement for works to grass pitches and other similar works to include works such as site clearance, earthworks, drainage, floodlighting, ballstop netting, fencing, working with topsoil to achieve a final platform, placing sand, etc, etc. It …
Reconfiguration of existing meeting room at Garrymore GAA Clubhouse to include building works as set out in appendix Provision of new doors and windows throughout the building Reconfiguration of existing meeting room at Garrymore GAA Clubhouse to include building works as set out in appendix Provision of new doors and …