RFI - A solution for medium voltages cable bundling

Medium-voltage cables are grouped in sets of three in a triangular configuration. This arrangement reduces the magnetic field between the cables, optimizing energy flow and minimizing net energy loss. Currently, the bundling of medium-voltage (MV) cables is a labor-intensive, manual process. Cables are grouped in sets of three and tied …

CPV: 44300000 Cable, alambre y productos conexos, 31321000 Líneas de energía eléctrica, 31321300 Cables de alta tensión, 44164000 Tubos de entubado y tubos de producción, 45231400 Trabajos de construcción de líneas de conducción eléctrica, 51110000 Servicios de instalación de equipo eléctrico, 71314100 Servicios de electricidad, 71334000 Servicios de ingeniería mecánica y eléctrica
Lugar de ejecución:
RFI - A solution for medium voltages cable bundling
Organismo adjudicador:
Enexis Groep
Número de premio:

1. Buyer

1.1 Buyer

Official name : Enexis Groep
Activity of the contracting entity : Electricity-related activities

2. Procedure

2.1 Procedure

Title : RFI - A solution for medium voltages cable bundling
Description : Medium-voltage cables are grouped in sets of three in a triangular configuration. This arrangement reduces the magnetic field between the cables, optimizing energy flow and minimizing net energy loss. Currently, the bundling of medium-voltage (MV) cables is a labor-intensive, manual process. Cables are grouped in sets of three and tied with a tie wrap every meter. With thousands of kilometers of MV cables planned for installation in the near future, this bundling task is increasingly time-consuming. Additionally, the repetitive nature of the work places significant physical strain on workers. Addressing both efficiency and workforce well-being is crucial to the success of this large-scale project. In an ideal scenario, the bundling process for medium-voltage (MV) cables would be streamlined to improve both efficiency and worker welfare. The goal is to implement a solution that can group cables quickly and accurately without requiring manual intervention at every meter. This innovation would substantially reduce installation time, enabling a more efficient workflow. In this envisioned setup, the installation process would not only be faster and more efficient but also safer and more sustainable. This would facilitate the successful deployment of thousands of kilometers of MV cables in future projects. By prioritizing productivity and employee welfare, this approach would lead to a more effective and harmonious operation overall.

2.1.1 Purpose

Main nature of the contract : Supplies
Additional nature of the contract : Services
Main classification ( cpv ): 44300000 Cable, wire and related products
Additional classification ( cpv ): 31321000 Electricity power lines
Additional classification ( cpv ): 31321300 High-voltage cable
Additional classification ( cpv ): 44164000 Casing and tubing
Additional classification ( cpv ): 45231400 Construction work for electricity power lines
Additional classification ( cpv ): 51110000 Installation services of electrical equipment
Additional classification ( cpv ): 71314100 Electrical services
Additional classification ( cpv ): 71334000 Mechanical and electrical engineering services

2.1.2 Place of performance

Country : Netherlands
Anywhere in the given country
Additional information : Zie documentation

2.1.3 Value

Estimated value excluding VAT : 0 Euro

2.1.4 General information

Legal basis :
Directive 2014/25/EU

3. Part

3.1 Part : PAR-0000

Title : RFI - A solution for medium voltages cable bundling
Description : Medium-voltage cables are grouped in sets of three in a triangular configuration. This arrangement reduces the magnetic field between the cables, optimizing energy flow and minimizing net energy loss. Currently, the bundling of medium-voltage (MV) cables is a labor-intensive, manual process. Cables are grouped in sets of three and tied with a tie wrap every meter. With thousands of kilometers of MV cables planned for installation in the near future, this bundling task is increasingly time-consuming. Additionally, the repetitive nature of the work places significant physical strain on workers. Addressing both efficiency and workforce well-being is crucial to the success of this large-scale project. In an ideal scenario, the bundling process for medium-voltage (MV) cables would be streamlined to improve both efficiency and worker welfare. The goal is to implement a solution that can group cables quickly and accurately without requiring manual intervention at every meter. This innovation would substantially reduce installation time, enabling a more efficient workflow. In this envisioned setup, the installation process would not only be faster and more efficient but also safer and more sustainable. This would facilitate the successful deployment of thousands of kilometers of MV cables in future projects. By prioritizing productivity and employee welfare, this approach would lead to a more effective and harmonious operation overall.

3.1.1 Purpose

Main nature of the contract : Supplies
Additional nature of the contract : Services
Main classification ( cpv ): 44300000 Cable, wire and related products
Additional classification ( cpv ): 31321000 Electricity power lines
Additional classification ( cpv ): 31321300 High-voltage cable
Additional classification ( cpv ): 44164000 Casing and tubing
Additional classification ( cpv ): 45231400 Construction work for electricity power lines
Additional classification ( cpv ): 51110000 Installation services of electrical equipment
Additional classification ( cpv ): 71314100 Electrical services
Additional classification ( cpv ): 71334000 Mechanical and electrical engineering services

3.1.2 Place of performance

Country : Netherlands
Anywhere in the given country
Additional information : Zie documentation

3.1.4 Value

Estimated value excluding VAT : 0 Euro

3.1.5 General information

Reserved participation : Participation is not reserved.

3.1.6 Procurement documents

Languages in which the procurement documents are officially available : English
Address of the procurement documents : https://s2c.mercell.com/today/118156 ,
Ad hoc communication channel
Name : RFI - A solution for medium voltages cable bundling

3.1.7 Terms of procurement

The execution of the contract must be performed within the framework of sheltered employment programmes : Not yet known

3.1.8 Techniques

Framework agreement :
No framework agreement
Information about the dynamic purchasing system :
Dynamic purchasing system, also usable by buyers not listed in this notice

3.1.9 Further information, mediation and review

Review organisation : Rechtbank Oost-Brabant
Organisation providing offline access to the procurement documents : Enexis Groep

8. Organisations

8.1 ORG-0001

Official name : Enexis Groep
Registration number : 17238877
Postal address : Magistratenlaan 116
Town : 's-Hertogenbosch
Postcode : 5223MB
Country : Netherlands
Contact point : Vincent Abbenhuis
Telephone : +31611867672
Roles of this organisation :
Buyer
Organisation providing offline access to the procurement documents

8.1 ORG-0002

Official name : Rechtbank Oost-Brabant
Registration number : 82956774
Department : .
Postal address : Leeghwaterlaan 8
Town : 's-Hertogenbosch
Postcode : 5223 BA
Country subdivision (NUTS) : Noordoost-Noord-Brabant ( NL413 )
Country : Netherlands
Contact point : .
Telephone : +31883621000
Internet address : https://www.rechtspraak.nl
Information exchange endpoint (URL) : https://www.rechtspraak.nl
Roles of this organisation :
Review organisation

11. Notice information

11.1 Notice information

Notice identifier/version : 1745f420-98fd-4b28-ac17-469e88501960 - 01
Form type : Planning
Notice type : Prior information notice or a periodic indicative notice used only for information
Notice dispatch date : 06/11/2024 09:58 +00:00
Notice dispatch date (eSender) : 06/11/2024 09:58 +00:00
Languages in which this notice is officially available : English Dutch

11.2 Publication information

Notice publication number : 00686227-2024
OJ S issue number : 219/2024
Publication date : 11/11/2024
Estimated date of publication of a contract notice within this procedure : 22/11/2024