Bonaire Fuel Terminal

Bonaire Bon Transition B.V. (BBT), established in April 2021 and fully owned by the Dutch state, is tasked with ensuring a reliable energy supply for Bonaire. This includes providing energy for living, working, and leisure activities. The Client’s mission is to store common fuels safely on the island and facilitate …

CPV: 45213200 Trabajos de construcción de almacenes y edificios industriales
Plazo:
30 de septiembre de 2024 a las 07:00
Tipo de plazo:
Presentación de una oferta
Lugar de ejecución:
Bonaire Fuel Terminal
Organismo adjudicador:
Bonaire Brandstof Terminals B.V.
Número de premio:
n/a

1. Buyer

1.1 Buyer

Official name : Bonaire Brandstof Terminals B.V.
Legal type of the buyer : Body governed by public law
Activity of the contracting authority : General public services

2. Procedure

2.1 Procedure

Title : Bonaire Fuel Terminal
Description : Bonaire Bon Transition B.V. (BBT), established in April 2021 and fully owned by the Dutch state, is tasked with ensuring a reliable energy supply for Bonaire. This includes providing energy for living, working, and leisure activities. The Client’s mission is to store common fuels safely on the island and facilitate the transition to a sustainable energy supply. This includes maintaining adequate fuel supplies for electricity generation, mobility, air travel, and clean drinking water production. The energy supply must be reliable, affordable, safe, and increasingly sustainable. Currently, Bonaire’s energy infrastructure is inadequate, with storage facilities either unavailable or non-compliant with regulations. The Client aims to develop a structural solution to guarantee reliable, affordable, and safe energy for residents and visitors alike. Project Goal The primary goal of the Hermes Bonaire project is to establish a state-of-the-art storage terminal that meets all technical, safety, and environmental standards, contributing to a sustainable and efficient improvement of Bonaire’s energy supply. This facility will support: Safe fuel delivery via an existing jetty. Jet A1 (kerosene) storage with a dedicated pipeline to the airport installation. Storage of diesel and Mogas, including a truck loading station for fuel transport to gas stations. Storage of industrial gasoil (IGO) for Contour Global Bonaire’s power plant, with a truck loading station for fuel transport. The project follows FIDIC Silver EPC guidelines, specifically designed for engineering-procurement-construction (EPC) and turnkey projects. The scope of the project consists of: 8 new storage tanks (+/-1000m3 / tank). 1 additive tank/drum for Stadis. 1 slop tank (21 m3) Product Recovery Tank (min. 200l) 4 pipelines from jetty to terminal. 1 Jet A1 pipeline from terminal to airport. 2 truck loading stations for Diesel and Mogas. 1 truck loading station for IGO at either of the above mentioned two truck loading stations. Vapour recovery unit for truck loading and for Mogas storage tanks. Buildings and utility buildings. Utilities. Fire-fighting system. Other installations as included in FEED documentation. The above-mentioned works is set out under various disciplines (8), including civil, tanks, piping & mechanical equipment, Electrical & Instrumentation & Automation and fire-fighting system. This includes all engineering work (Basic, and Detailed Engineering) required for all, without claiming to be complete, civil engineering and structural aspects, mechanical, electrical engineering, instrumentation, automation, as well as all technical installations, connections, and the complete as-built documentation. Specific Objectives: 1. Design, Procurement, Construction, and Commissioning; The Contractor will be responsible for the EPC Turnkey design, procurement, construction, and commissioning of all necessary facilities and infrastructures for the storage terminal, including tanks, piping, pumps, and electrical installations. The Contractor will deliver detailed engineering, procurement, material supply and disposal, construction, commissioning, and an operational terminal. 2. Compliance with Standards and Regulations; The project must comply with the latest PGS 29, 2022 standards, Dutch laws, Eurocodes, and other relevant codes to ensure safety and quality. 3. Environmental Protection; Measures will be taken to minimize environmental impact, including installing a vapour recovery unit for trucks and Mogas storage tanks, and adhering to environmental regulations. 4. Operational Continuity; The Contractor must ensure that the operations of surrounding facilities, particularly the adjacent airport, are not disrupted during the project. Public disturbances are unacceptable without written approval from the Client. 5. Quality Assurance and Safety; The project will adhere to strict quality assurance and safety standards, including regular progress reporting and monitoring of compliance with labour and safety regulations. 6. Efficient Communication and Collaboration; There will be regular communication and coordination between the Client and Contractor, including progress meetings and technical consultations. All communication will take place in Dutch unless otherwise agreed. Purpose of the Invitation to Tender Provide potential companies with information about the contract and tendering procedure. Clarify how companies can submit their offers, the tender requirements, and submission deadlines. Offer insight into the tendering process, evaluation of submissions, and subsequent procedures”. Any company can gain free access to the tender documentation. To gain access to the tender documents, the attached NDA must be signed and submitted. This can be done via the message box in Mercell. If you have any questions, you can also contact us in the message box.
Procedure identifier : f9ee3c78-08c0-4cac-b22b-45bd6466013f
Internal identifier : n/a
Type of procedure : Open
The procedure is accelerated : no
Justification for the accelerated procedure :
Main features of the procedure : NDA is required and provided

2.1.1 Purpose

Main nature of the contract : Works
Additional nature of the contract : Services
Main classification ( cpv ): 45213200 Construction work for warehouses and industrial buildings

2.1.2 Place of performance

Country : Bonaire, Sint Eustatius and Saba
Additional information : See documentation

2.1.3 Value

Estimated value excluding VAT : 22 500 000 Euro

2.1.4 General information

Legal basis :
Directive 2014/24/EU

2.1.6 Grounds for exclusion

Analogous situation like bankruptcy under national law : See documentation
Bankruptcy : See documentation
Corruption : See documentation
Arrangement with creditors : See documentation
Participation in a criminal organisation : See documentation
Agreements with other economic operators aimed at distorting competition : See documentation
Breaching of obligations in the fields of environmental law : See documentation
Money laundering or terrorist financing : See documentation
Fraud : See documentation
Child labour and other forms of trafficking in human beings : See documentation
Insolvency : See documentation
Breaching of obligations in the fields of labour law : See documentation
Assets being administered by liquidator : See documentation
Guilty of misrepresentation, withheld information, unable to provide required documents and obtained confidential information of this procedure : See documentation
Conflict of interest due to its participation in the procurement procedure : See documentation
Direct or indirect involvement in the preparation of this procurement procedure : See documentation
Guilty of grave professional misconduct : See documentation
Early termination, damages or other comparable sanctions : See documentation
Breaching of obligations in the fields of social law : See documentation
Payment of social security contributions : See documentation
Business activities are suspended : See documentation
Payment of taxes : See documentation
Terrorist offences or offences linked to terrorist activities : See documentation

5. Lot

5.1 Lot technical ID : LOT-0000

Title : Bonaire Fuel Terminal
Description : Bonaire Bon Transition B.V. (BBT), established in April 2021 and fully owned by the Dutch state, is tasked with ensuring a reliable energy supply for Bonaire. This includes providing energy for living, working, and leisure activities. The Client’s mission is to store common fuels safely on the island and facilitate the transition to a sustainable energy supply. This includes maintaining adequate fuel supplies for electricity generation, mobility, air travel, and clean drinking water production. The energy supply must be reliable, affordable, safe, and increasingly sustainable. Currently, Bonaire’s energy infrastructure is inadequate, with storage facilities either unavailable or non-compliant with regulations. The Client aims to develop a structural solution to guarantee reliable, affordable, and safe energy for residents and visitors alike. Project Goal The primary goal of the Hermes Bonaire project is to establish a state-of-the-art storage terminal that meets all technical, safety, and environmental standards, contributing to a sustainable and efficient improvement of Bonaire’s energy supply. This facility will support: Safe fuel delivery via an existing jetty. Jet A1 (kerosene) storage with a dedicated pipeline to the airport installation. Storage of diesel and Mogas, including a truck loading station for fuel transport to gas stations. Storage of industrial gasoil (IGO) for Contour Global Bonaire’s power plant, with a truck loading station for fuel transport. The project follows FIDIC Silver EPC guidelines, specifically designed for engineering-procurement-construction (EPC) and turnkey projects. The scope of the project consists of: 8 new storage tanks (+/-1000m3 / tank). 1 additive tank/drum for Stadis. 1 slop tank (21 m3) Product Recovery Tank (min. 200l) 4 pipelines from jetty to terminal. 1 Jet A1 pipeline from terminal to airport. 2 truck loading stations for Diesel and Mogas. 1 truck loading station for IGO at either of the above mentioned two truck loading stations. Vapour recovery unit for truck loading and for Mogas storage tanks. Buildings and utility buildings. Utilities. Fire-fighting system. Other installations as included in FEED documentation. The above-mentioned works is set out under various disciplines (8), including civil, tanks, piping & mechanical equipment, Electrical & Instrumentation & Automation and fire-fighting system. This includes all engineering work (Basic, and Detailed Engineering) required for all, without claiming to be complete, civil engineering and structural aspects, mechanical, electrical engineering, instrumentation, automation, as well as all technical installations, connections, and the complete as-built documentation. Specific Objectives: 1. Design, Procurement, Construction, and Commissioning; The Contractor will be responsible for the EPC Turnkey design, procurement, construction, and commissioning of all necessary facilities and infrastructures for the storage terminal, including tanks, piping, pumps, and electrical installations. The Contractor will deliver detailed engineering, procurement, material supply and disposal, construction, commissioning, and an operational terminal. 2. Compliance with Standards and Regulations; The project must comply with the latest PGS 29, 2022 standards, Dutch laws, Eurocodes, and other relevant codes to ensure safety and quality. 3. Environmental Protection; Measures will be taken to minimize environmental impact, including installing a vapour recovery unit for trucks and Mogas storage tanks, and adhering to environmental regulations. 4. Operational Continuity; The Contractor must ensure that the operations of surrounding facilities, particularly the adjacent airport, are not disrupted during the project. Public disturbances are unacceptable without written approval from the Client. 5. Quality Assurance and Safety; The project will adhere to strict quality assurance and safety standards, including regular progress reporting and monitoring of compliance with labour and safety regulations. 6. Efficient Communication and Collaboration; There will be regular communication and coordination between the Client and Contractor, including progress meetings and technical consultations. All communication will take place in Dutch unless otherwise agreed. Purpose of the Invitation to Tender Provide potential companies with information about the contract and tendering procedure. Clarify how companies can submit their offers, the tender requirements, and submission deadlines. Offer insight into the tendering process, evaluation of submissions, and subsequent procedures”. Any company can gain free access to the tender documentation. To gain access to the tender documents, the attached NDA must be signed and submitted. This can be done via the message box in Mercell. If you have any questions, you can also contact us in the message box.
Internal identifier : n/a

5.1.1 Purpose

Main nature of the contract : Works
Additional nature of the contract : Services
Main classification ( cpv ): 45213200 Construction work for warehouses and industrial buildings

5.1.2 Place of performance

Country : Bonaire, Sint Eustatius and Saba
Additional information : See documentation

5.1.3 Estimated duration

Duration : 3 Year

5.1.5 Value

Estimated value excluding VAT : 22 500 000 Euro

5.1.6 General information

Reserved participation : Participation is not reserved.
Procurement Project not financed with EU Funds.
The procurement is covered by the Government Procurement Agreement (GPA) : no

5.1.9 Selection criteria

Criterion :
Type : Economic and financial standing
Name : See documentation
Description : See documentation
Use of this criterion : Used
Criterion :
Type : Suitability to pursue the professional activity
Name : See documentation
Description : See documentation
Use of this criterion : Used
Criterion :
Type : Technical and professional ability
Name : See documentation
Description : See documentation
Use of this criterion : Used

5.1.11 Procurement documents

Address of the procurement documents : https://s2c.mercell.com/today/90719

5.1.12 Terms of procurement

Terms of submission :
Electronic submission : Allowed
Address for submission : https://s2c.mercell.com/today/90719
Languages in which tenders or requests to participate may be submitted : English
Electronic catalogue : Not allowed
Deadline for receipt of tenders : 30/09/2024 07:00 +00:00
Information about public opening :
Opening date : 30/09/2024 22:00 +00:00
Terms of contract :
The execution of the contract must be performed within the framework of sheltered employment programmes : No
Electronic invoicing : Required
Electronic ordering will be used : no
Electronic payment will be used : yes

5.1.15 Techniques

Framework agreement :
No framework agreement
Information about the dynamic purchasing system :
No dynamic purchase system
Electronic auction : no

5.1.16 Further information, mediation and review

Review organisation : Rechtbank Midden Nederland

8. Organisations

8.1 ORG-0001

Official name : Bonaire Brandstof Terminals B.V.
Registration number : 82637490
Postal address : Lange Voorhout 29
Town : 's-Gravenhage
Postcode : 2514EB
Country : Netherlands
Contact point : Renée Beurmanjer
Telephone : +31640872560
Roles of this organisation :
Buyer

8.1 ORG-0002

Official name : Rechtbank Midden Nederland
Registration number : 82940444
Town : Utrecht
Country : Netherlands
Telephone : 0640872560
Roles of this organisation :
Review organisation

11. Notice information

11.1 Notice information

Notice identifier/version : bff148a8-7892-4ce5-a4f8-709c86531f3c - 01
Form type : Competition
Notice type : Contract or concession notice – standard regime
Notice dispatch date : 02/08/2024 12:21 +00:00
Notice dispatch date (eSender) : 02/08/2024 13:37 +00:00
Languages in which this notice is officially available : English

11.2 Publication information

Notice publication number : 00472638-2024
OJ S issue number : 152/2024
Publication date : 06/08/2024