Trabajos de construcción para proyectos hidráulicos

Barbados Climate Resilient South Coast Water Reclamation Project

Construction of the new South Coast Water Reclamation Plant with an average dry weather flow of 9,000 m3/day, together with installation of estimated 30 km of pipelines and infrastructure for transporting reclaimed water for irrigation and aquifer recharge. This is a Preliminary Information Notice for a two-stage procurement process for …

CPV: 45240000 Trabajos de construcción para proyectos hidráulicos
Lugar de ejecución:
Barbados Climate Resilient South Coast Water Reclamation Project
Organismo adjudicador:
Barbados Water Authority
Número de premio:
EIB-GtP/ENR/WM

Barbados-St. Michael: Construction work for water projects

2024/S 019-052455

Prior information notice

This notice is for prior information only

Works

Legal Basis:

The government of Barbados has applied for funding from the Inter-American Development Bank and the Green Climate Fund to pay for the upfront investment costs, in combination with a proposed innovative debt-for-climate swap supported by the Inter-American Development Bank and the European Investment Bank.

Section I: Contracting authority

I.1) Name and addresses
Official name: Barbados Water Authority
Postal address: Errol Barrow Highway
Town: St. Michael
NUTS code: BB Barbados
Postal code: 0000
Country: Barbados
Contact person: Ms. Shelley Parris
E-mail: shelley.parris@bwa.gov.bb
Telephone: +1 2464344292
Internet address(es):
Main address: https://barbadoswaterauthority.com/
I.3) Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at:
Additional information can be obtained from the abovementioned address
I.4) Type of the contracting authority
Ministry or any other national or federal authority, including their regional or local subdivisions
I.5) Main activity
Other activity: Water

Section II: Object

II.1) Scope of the procurement
II.1.1) Title:

Barbados Climate Resilient South Coast Water Reclamation Project

Reference number: EIB-GtP/ENR/WM
II.1.2) Main CPV code
45240000 Construction work for water projects
II.1.3) Type of contract
Works
II.1.4) Short description:

Construction of the new South Coast Water Reclamation Plant with an average dry weather flow of 9,000 m3/day, together with installation of estimated 30 km of pipelines and infrastructure for transporting reclaimed water for irrigation and aquifer recharge.

II.1.5) Estimated total value
II.1.6) Information about lots
This contract is divided into lots: no
II.2) Description
II.2.3) Place of performance
NUTS code: BB Barbados
Main site or place of performance:

Graeme Hall, Christ Church, Barbados

II.2.4) Description of the procurement:

This is a Preliminary Information Notice for a two-stage procurement process for a Design Build EPC/Turnkey construction contract and O&M and training for an initial period of 3 years, with pre-qualification notice expected to be published in early February 2024.

II.2.14) Additional information

Project involves upgrading and building new wastewater treatment facilities with advanced water treatment, and installing pipelines and infrastructure for reclaimed water reuse for irrigation and aquifer recharge, prioritizing climate resilience, energy efficiency and sustainability.

II.3) Estimated date of publication of contract notice:
16/02/2024

Section IV: Procedure

IV.1) Description
IV.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no

Section VI: Complementary information

VI.3) Additional information:
VI.5) Date of dispatch of this notice:
23/01/2024