Rv. 13 Lovraeidet – Rødsliane is an avalanche protection measure on national road 13 Sandsvegen between Lovraeidet and Rødsliane in Suldal municipality, Rogaland. A new tunnel shall be engineered and established past the Rødsliane and associated open air zones. Rv. 13 Lovraeidet – Rødsliane is an avalanche protection measure on …
St2315, Neubau der Ortsumgehung Hafenlohr Diese Vorinformation umfasst mehrere Gewerke, teilweise mit Planungsleistungen. St2315, Neubau der Ortsumgehung Hafenlohr, Straßen- und Brückenbauarbeiten Diese Vorinformation umfasst mehrere Gewerke, teilweise mit Planungsleistungen.
Claureen Link Road is approximately 650m in length . It will connect into a new proposed roundabout on the Drumcliffe Road/ Claureen Drive to the north and to a new arm on the N85/ Lahinch Road roundabout to the south. The scope of works of this contract involves : - …
Road Resurfacing Contracts on National, Regional and Local Roads in County Louth. Comprising road pavement works, provision of road drainage, repositioning utility covers, road markings, signing, delineation, traffic calming measures, hedge cutting and other assocaited works as described in Volume A. Various locations in Co Louth. Road Resurfacing Contracts on …
REVOCA - AFFIDAMENTO DELL’APPALTO INTEGRATO DI PROGETTAZIONE ESECUTIVA E DI ESECUZIONE LAVORI AFFERENTI ALL’INTERVENTO DI “ESTENSIONE DELLE INFRASTRUTTURE COMUNI PER LO SVILUPPO DEL PUNTO FRANCO NUOVO NEL PORTO DI TRIESTE (TS) - PROGETTO AdSP 1951, FASCICOLO A” ai sensi dell’articolo 72, del Decreto Legislativo 31 marzo 2023, n. 36 CIG: …
The Abbeyfeale Public Realm Scheme Phase 1 consists of upgrading 440 metres on Killarney Road N21; the construction of a 90 metre temporary traffic diversion route from St. Ita’s Terrace to Killarney Road N21; construction of 100 metre new Link Road at O’Riordan’s and upgrading of Grove Crescent car park. …
Straßenbau- und Nebenarbeiten Straßenbau-, Pflasterungs- und Nebenarbeiten
This section of the network was identified as in need of repair, cracking and rutting are visible along the length of the scheme. Previously patching had been carried out on the pavement at various locations along the route. The works will be undertaken along the N12 in Knockaconny to Tullylish, …
IMT010/2023/0077 Cleaning of Stormwater Culverts and CCTV - South IMT010/2023/0077 Cleaning of Stormwater Culverts and CCTV - South
Im Bereich zwischen dem Südportal des bestehenden Tunnels Giswil und dem neuen Tunnel Kaiserstuhl (separate, bereits erfolgte Vergabe als Baulos 19) wird die Strasseninfrastruktur erweitert, damit künftig National- und Kantonsstrasse getrennt über zwei separate Trassees geführt werden können. Parallel zur bestehenden Buochholzbrücke wird eine neue, rund 215m lange Strassenbrücke erstellt. …