Rozbudowa drogi krajowej nr 22 na odcinku Podgaje – granica województwa w zakresie budowy ścieżki rowerowe, przebudowy 3 skrzyżowań i budowy kanału technologicznego. Rozbudowa drogi krajowej nr 22 na odcinku Podgaje – granica województwa w zakresie budowy ścieżki rowerowe, przebudowy 3 skrzyżowań i budowy kanału technologicznego.
Obiectul contractului il reprezinta proiectarea si executia lucrarilor pentru „DN 73 C, km 44+800 – km 55+000, Curtea de Arges - Tigveni” (LOT 1) in lungime de aproximativ 10,2 km, in conformitate cu prevederile contractului de lucrari. In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016 cu …
- remplacement des fossés enherbés par des fossés bétonnés de 1,20 ou 1,80 ou 2,20 mètres de largeur, - redimensionnement du réseau de collecte en assainissement profond (y compris en TPC), - création de nouvelles traversées de chaussée, - renforcement et revêtement du TPC, - modification ou remplacement des dispositifs …
BAB A72 Grunderneuerung G70 Grundhafte Erneuerung der Fahrbahnen und Verbreiterung der Richtungsfahrbahnen auf 12,50 m; Instandsetzung und Teilerneuerung der Entwässerungseinrichtungen; Erneuerung der Fahrbahnmarkierungen; Instandsetzung der Brückenbauwerke, Verkehrssicherung Grunderneuerung G70 - Los B - Grundhafte Erneuerung der Fahrbahn und Verbreitung der Richtungsfahrbahn auf 12,50 m; - Instandsetzung und Teilerneuerung der Entwässerungseinrichtungen; …
Riigitee 52 Viljandi-Rõngu km 25,093-41,42 Mustla-Kaubi lõigu rekonstrueerimine, sh Tarvastu silla ehitus ja Suislepa silla rekonstrueerimine ning remonditööd Mustla alevikus, vastavalt riigihanke alusdokumentides sätestatud tingimustele. Riigitee 52 Viljandi-Rõngu km 25,093-41,42 Mustla-Kaubi lõigu rekonstrueerimine, sh Tarvastu silla ehitus ja Suislepa silla rekonstrueerimine ning remonditööd Mustla alevikus, vastavalt riigihanke alusdokumentides sätestatud tingimustele.
The works include transverse and longitudinal road markings with sprayed thermoplastic and spray plastic along national and European roads in Innlandet County, with the accompanying cycle path network. The workers also include milling for road marking and removing road markings. Also includes cleaning before laying longitudinal and transverse marking. The …
New railings and road lights shall be established on the stretch Minnesund-Tangen. The contract includes disassembly of e.g. railings in corten steel, assembly of new railings and new road lights. There are strict requirements for work notifications on the stretch. The speed limit is 110 km/h with an ÅDT between …
The works include transverse and longitudinal road markings with sprayed thermoplastic and spray plastic along national and European roads, with the accompanying cycle path network. The workers also include milling for road marking and removing road markings. Also includes cleaning before laying longitudinal and transverse marking. The geographical area is …
SS 189 Itinerario Agrigento - Palermo. Sistemazione e messa in sicurezza dello svincolo al km. 24 della SS 189 (sv. San Giovanni Gemini in località Tumarrano). SS 189 Itinerario Agrigento - Palermo. Sistemazione e messa in sicurezza dello svincolo al km. 24 della SS 189 (sv. San Giovanni Gemini in …
A14, Los 3.3 verkehrswirksame Anbindung 1153 mit folgenden Hauptmassen: ca. 22.000 m² Vegetationsfläche bearbeiten ca. 12.000 m³ Oberboden abtragen / lösen ca. 10.000 m³ Boden lösen + austauschen + einbauen ca. 20.500 m² Asphalt fräsen ca. 1.000 t gefährlicher Abfall inkl. Entsorgung ca. 6.000 t nicht gefährlicher Abfall inkl. Entsorgung …