CONTR 2024 854274 UPPS- ACUERDO MARCO PARA SUMINISTRO DE SEÑALIZACIÓN DE DIVERSA TIPOLOGÍA DE USO PUBLICO EN LOS ESPACIOS NATURALES DE ANDALUCÍA, EN OTROS ENCLAVES NATURALES, EN CENTROS GESTIONADOS POR LA AGENCIA DE MEDIO AMBIENTE Y OTROS TIPOS DE SEÑALIZACIÓN CONTR 2024 854274 UPPS- ACUERDO MARCO PARA SUMINISTRO DE SEÑALIZACIÓN …
Full reconstruction in granite of the footpaths and carriageways on Duke Street, Anne Street South, Lemon Street and Duke Lane Upper. The existing footpaths will be realigned, widened and repaved with new granite slabs laid on a new high strength bedding mortar, while retaining areas of historic kerbs and paving. …
Establishment of a Dynamic Purchasing System for Civil, Electrical and Preparatory Works in an Environmentally Friendly Manner in Connection with the Installation of Charging Pillars Across Malta and Gozo for the Energy and Water Agency Establishment of a Dynamic Purchasing System for Civil, Electrical and Preparatory Works in an Environmentally …