This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and …
CPV: 45111000 Demolition, site preparation and clearance work, 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 45232130 Storm-water piping construction work, 45232451 Drainage and surface works, 45232452 Drainage works, 45232454 Rain-water basin construction work, 45233100 Construction work for highways, roads, 45233120 Road construction works, 45233125 Road junction construction work, 45233140 Roadworks, 45233161 Footpath construction work, 45111200 Site preparation and clearance work, 45233162 Cycle path construction work, 45233222 Paving and asphalting works, 45233223 Carriageway resurfacing works, 45233290 Installation of road signs, 45233291 Installation of bollards, 45233300 Foundation work for highways, roads, streets and footpaths, 45262510 Stonework, 45111213 Site-clearance work, 45111240 Ground-drainage work, 45112700 Landscaping work, 45112710 Landscaping work for green areas, 45112711 Landscaping work for parks, 45112730 Landscaping work for roads and motorways, 45220000 Engineering works and construction works, 45222000 Construction work for engineering works except bridges, tunnels, shafts and subways