Stavanger municipality would like, via this competition, to enter into a contract for replacing water and sewage installations from the centre of Hinna, through Heimdalsveien to Jåttåvågen. It will be dug through the railway. A new road shall also be established in Jåttåvågen.Jåttåvågen 2 - Sewage Hinna is a sewage …

CPV: 45232000 Ancillary works for pipelines and cables, 45000000 Construction work, 45200000 Works for complete or part construction and civil engineering work, 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 45231000 Construction work for pipelines, communication and power lines, 45231300 Construction work for water and sewage pipelines, 45233000 Construction, foundation and surface works for highways, roads, 45233300 Foundation work for highways, roads, streets and footpaths, 45234000 Construction work for railways and cable transport systems, 71311220 Highways engineering services, 71322200 Pipeline-design services, 71800000 Consulting services for water-supply and waste consultancy
Deadline:
Jan. 8, 2025, 11 a.m.
Deadline type:
Submitting a bid
Place of execution:
Jåttåvågen 2 - Sewage Hinna ET02 - water, sewage and roads
Awarding body:
Stavanger kommune
Award number:
24/53331

1. Buyer

1.1 Buyer

Official name : Stavanger kommune
Legal type of the buyer : Body governed by public law, controlled by a local authority
Activity of the contracting authority : General public services

2. Procedure

2.1 Procedure

Title : Jåttåvågen 2 - Sewage Hinna ET02 - water, sewage and roads
Description : Stavanger municipality would like, via this competition, to enter into a contract for replacing water and sewage installations from the centre of Hinna, through Heimdalsveien to Jåttåvågen. It will be dug through the railway. A new road shall also be established in Jåttåvågen.Jåttåvågen 2 - Sewage Hinna is a sewage project in the Jåttåvågen development area and at Hinna. The project is divided into several stages. The engineering design work for this project is in the disciplines of water and sewage, road, structural engineering (RIB), lark, geotechnics and track. Norconsult is responsible for engineering design services for this project. Jåttåvågen 2 – V1 is a road project in the development area Jåttåvågen. The road V1 will be established after the water and sewage plant for the project Jåttåvågen 2 - sewage Hinna has been completed. The engineering design work for this project is in the disciplines of water and sewage, roads, structural engineering (RIB), lark and geotechnics. Asplan Viak is responsible for engineering design for this project.
Procedure identifier : 0819527d-c5e6-4684-961f-b474f9849f8b
Internal identifier : 24/53331
Type of procedure : Open
The procedure is accelerated : no
Justification for the accelerated procedure :
Main features of the procedure : The procurement will be in accordance with the Law on Public Procurements and the Public Procurement Regulations, part III.[VV1]Contract will be in accordance with NS 8405 Norwegian building and construction contract, as well as the Contracting Authority's Special Contract Terms for NS 8405. Stavanger municipality ́s seriousness provisions, requirements and conditions for climate and environment for construction sites and construction areas[VV2] will also be used for this contract. Stavanger Utvikling is responsible for the development of the main infrastructure and facilitation for the transformation of Jåttåvågen 2 development area. The development will be regulated by the area plan for Jåttåvågen 2 (Plan no. 2376). In order to facilitate the planned development and development of the area, Stavanger Utvikling has ordered several projects via Stavanger municipality, City Environment and Development (BMU), Construction Projects.In addition, Stavanger municipality BMU v/VAR is the orderer of various water and sewage installations. The project is called Jåttåvågen 2 – Sewage Hinna. This project is divided into several stages. Stages 1 up to and including 4. Stage 1 (water and sewage installations) and stage 4 (new pumping station) will be completed round summer 2024.In addition to the establishment of the Water and Sewage, an access road with a foot/cycle path and discounts (V1) north along the railway shall be constructed. A flood path shall be established. Road lighting shall be set up. Cables for Lnett and fibre shall be taken with. The execution of this project starts early in spring 2025 and shall be completed in autumn 2026.The contracting authority points out that the progress in terms of excavation at and on the railway in the period Easter 2026 [VV3] is unalterable, as there are planned train stoppages in this period. The contractor must reckon on planning their own work that the area by the railway is available for their work from xxxxx-cathrine. This must involve construction work outside ordinary working hours. Tenderers must, therefore, within the limits of the Working Environment Act and the Act on holiday peace, plan the work so that the deadline is held. The project shall follow the progress plan with different open air deadlines in accordance with information written in this competition. [VV1] Think it's part III[VV2]new[VV3]More detailed about the period.

2.1.1 Purpose

Main nature of the contract : Works
Main classification ( cpv ): 45232000 Ancillary works for pipelines and cables
Additional classification ( cpv ): 45000000 Construction work
Additional classification ( cpv ): 45200000 Works for complete or part construction and civil engineering work
Additional classification ( cpv ): 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Additional classification ( cpv ): 45231000 Construction work for pipelines, communication and power lines
Additional classification ( cpv ): 45231300 Construction work for water and sewage pipelines
Additional classification ( cpv ): 45233000 Construction, foundation and surface works for highways, roads
Additional classification ( cpv ): 45233300 Foundation work for highways, roads, streets and footpaths
Additional classification ( cpv ): 45234000 Construction work for railways and cable transport systems
Additional classification ( cpv ): 71311220 Highways engineering services
Additional classification ( cpv ): 71322200 Pipeline-design services
Additional classification ( cpv ): 71800000 Consulting services for water-supply and waste consultancy

2.1.2 Place of performance

Country subdivision (NUTS) : Rogaland ( NO0A1 )
Country : Norway

2.1.3 Value

Estimated value excluding VAT : 90 000 000 Norwegian krone

2.1.4 General information

Legal basis :
Directive 2014/24/EU
Anskaffelsesforskriften -
Anskaffelsesforskriften -

2.1.6 Grounds for exclusion

Analogous situation like bankruptcy under national law : Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Bankruptcy : Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Corruption : Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Arrangement with creditors : Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Participation in a criminal organisation : Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
Agreements with other economic operators aimed at distorting competition : Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Breaching of obligations in the fields of environmental law : Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Money laundering or terrorist financing : Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
Fraud : Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
Child labour and other forms of trafficking in human beings : Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Insolvency : Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Breaching of obligations in the fields of labour law : Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Assets being administered by liquidator : Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Guilty of misrepresentation, withheld information, unable to provide required documents and obtained confidential information of this procedure : Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Conflict of interest due to its participation in the procurement procedure : Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Direct or indirect involvement in the preparation of this procurement procedure : Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Guilty of grave professional misconduct : Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Early termination, damages or other comparable sanctions : Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Breaching of obligations in the fields of social law : Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Payment of social security contributions : Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Business activities are suspended : Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Payment of taxes : Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Terrorist offences or offences linked to terrorist activities : Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.

5. Lot

5.1 Lot technical ID : LOT-0000

Title : Jåttåvågen 2 - Sewage Hinna ET02 - water, sewage and roads
Description : Stavanger municipality would like, via this competition, to enter into a contract for replacing water and sewage installations from the centre of Hinna, through Heimdalsveien to Jåttåvågen. It will be dug through the railway. A new road shall also be established in Jåttåvågen.Jåttåvågen 2 - Sewage Hinna is a sewage project in the Jåttåvågen development area and at Hinna. The project is divided into several stages. The engineering design work for this project is in the disciplines of water and sewage, road, structural engineering (RIB), lark, geotechnics and track. Norconsult is responsible for engineering design services for this project. Jåttåvågen 2 – V1 is a road project in the development area Jåttåvågen. The road V1 will be established after the water and sewage plant for the project Jåttåvågen 2 - sewage Hinna has been completed. The engineering design work for this project is in the disciplines of water and sewage, roads, structural engineering (RIB), lark and geotechnics. Asplan Viak is responsible for engineering design for this project.
Internal identifier : 24/53331

5.1.1 Purpose

Main nature of the contract : Works
Main classification ( cpv ): 45232000 Ancillary works for pipelines and cables
Additional classification ( cpv ): 45000000 Construction work
Additional classification ( cpv ): 45200000 Works for complete or part construction and civil engineering work
Additional classification ( cpv ): 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Additional classification ( cpv ): 45231000 Construction work for pipelines, communication and power lines
Additional classification ( cpv ): 45231300 Construction work for water and sewage pipelines
Additional classification ( cpv ): 45233000 Construction, foundation and surface works for highways, roads
Additional classification ( cpv ): 45233300 Foundation work for highways, roads, streets and footpaths
Additional classification ( cpv ): 45234000 Construction work for railways and cable transport systems
Additional classification ( cpv ): 71311220 Highways engineering services
Additional classification ( cpv ): 71322200 Pipeline-design services
Additional classification ( cpv ): 71800000 Consulting services for water-supply and waste consultancy

5.1.2 Place of performance

Country subdivision (NUTS) : Rogaland ( NO0A1 )
Country : Norway
Additional information :

5.1.3 Estimated duration

Start date : 02/03/2025
Duration end date : 01/12/2026

5.1.5 Value

Estimated value excluding VAT : 90 000 000 Norwegian krone

5.1.6 General information

Reserved participation : Participation is not reserved.
Procurement Project not financed with EU Funds.
The procurement is covered by the Government Procurement Agreement (GPA) : no

5.1.7 Strategic procurement

Social objective promoted : Human rights due diligence in global supply chains
Innovative objective : The procured works, supplies or services are novel or significantly improved compared to other works, supplies, or services already on the market.

5.1.9 Selection criteria

Criterion :
Type : Economic and financial standing
Name : 'Total' annual turnover
Description : The tenderer ́s ("total") annual turnover for the number of financial years requested in the tender notice or in the procurement documents is as follows:
Use of this criterion : Not used
Criterion :
Type : Economic and financial standing
Name : Average annual turnover
Description : The tenderer ́s average annual turnover for the number of years requested in the notice or in the procurement documents is as follows:
Use of this criterion : Not used
Criterion :
Type : Economic and financial standing
Name : "Specific annual turnover"
Description : Are the tenderer's ("specific") annual turnover within the area that the contract applies to and specified in the notice or in the procurement documents for the number of accounting years requested is as follows: Minimum qualification requirements Tenderers must be able to document having a minimum of NOK. NOK 50,000,000 in operational income for the last available financial year.
Use of this criterion : Used
Criterion :
Type : Economic and financial standing
Name : Average set-up
Description : Is the tenderer's average annual turnover within the area requested by the contract and specified in the notice or in the procurement documents for the number of financial years requested:
Use of this criterion : Not used
Criterion :
Type : Economic and financial standing
Name : The tenderer's establishment date
Description : If the information about the turnover (combined or specific) is not available for the entire requested period, please state the date the company was established, or the tenderers started their business:
Use of this criterion : Not used
Criterion :
Type : Economic and financial standing
Name : Financial key figures
Description : For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures are as follows:
Use of this criterion : Not used
Criterion :
Type : Economic and financial standing
Name : Liability insurance
Description : The insured amount in the tenderer ́s liability insurance is the following:
Use of this criterion : Not used
Criterion :
Type : Economic and financial standing
Name : Other economic and financial requirements
Description : Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that: Minimum qualification requirements Requirement: Tenderers must have the financial ability to fulfil the contract. Documentation: As documentation, the Contracting Authority will obtain the credit rating Commercial Delphi Score from Experian. Tenderers must be in risk class 5 or higher on the Experian scale. It is a prerequisite that the tenderer has known registered information about the company and consents by submitting the tender for the information to be collected and used as a basis for assessing the tenderer's financial conditions. If the tenderer is aware that the requirement for financial ability to fulfil the contract cannot be met through a credit rating as stated above, the tenderer must submit other documentation confirming/explaining that the financial ability is satisfactory to fulfil the contract. If the contracting authority ́s credit information about each company does not include a credit rating, or the tenderer does not comply with the credit rating requirement, the Contracting Authority may attempt to cover its documentation need in another way, either by assessing whether the financial ability is satisfactory based on the other information presented in the system from Experian or by collecting other documentation. Tenderers can be assessed separately in the case of mergers/acquisitions/new businesses.
Use of this criterion : Used
Criterion :
Type : Other
Name : Certificates issued by independent bodies for quality assurance standards.
Description : Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements? Minimum qualification requirements Requirement: A good and functioning quality assurance system is required for the services that shall be provided. Documentation: Tenderers must be able to present a certificate for the company's quality system/management system issued by independent bodies that confirms the tenderer fulfils recognised quality assurance standards (ISO 9001:2015 or equivalent). The contracting authority will also accept other documentation, not issued by an independent body, which shows that the tenderer has a well functioning system for ensuring quality customised to the nature and scope of the assignment. As a minimum, a general description of the system ́s content, including an overview of inspection plans and check-lists that are relevant for the assignment, must be submitted.
Use of this criterion : Used
Criterion :
Type : Other
Name : Certificates issued by independent bodies for environmental management standards.
Description : Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards?
Use of this criterion : Not used
Criterion :
Type : Suitability to pursue the professional activity
Name : Registered in a trade register
Description : Tenderers are registered in a professional register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Use of this criterion : Not used
Criterion :
Type : Suitability to pursue the professional activity
Name : Registered in a trade register or company register.
Description : Tenderers are registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex. Minimum qualification requirements Requirement: Tenderers must prove that they are registered in a trade or other business register as prescribed by the law of the country where they are established. Documentation: Documentation for Norwegian companies will, for example, be a company registration certificate from the Brønnøysund Register Centre. The documentation shall not be older than 6 months from the tender deadline. The documentation shall be in Norwegian.
Use of this criterion : Used
Criterion :
Type : Technical and professional ability
Name : Only for building and construction works:
Description : Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The contracting authority can require up to five years experience and allow experience from the previous five years to be taken into consideration. Minimum qualification requirements Requirement: The tenderer shall have sufficient experience from equivalent assignments. By equivalent assignments we mean assignments of equivalent complexity, nature, scope and value as requested in this competition. Equivalent complexity, nature, means that the contractor shall have carried out deliveries involving both the establishment of water, sewage, roads, green areas, cables and experience with excavation at and on the railway. Equivalent value is deliveries with a total sum of at least NOK 50 million. The requirement will be seen as fulfilled if the tenderer can refer to three equivalent reference projects during the last five years, documenting experience with the above mentioned disciplines (water, sewage, roads, green areas, cables and experience with excavation at and on the railway). All disciplines do not need to be executed in the same delivery. Documentation requirement: The contracting authority has prepared a form that the tenderer shall use to respond to this qualification requirement. See annex 1.3 . The qualification requirement relates to the tendering company as such, not to individual persons ́pers experience. Tenderers can be assessed separately in the case of mergers/acquisitions/new businesses. References may be contacted in order to confirm the provided information.
Use of this criterion : Used
Criterion :
Type : Technical and professional ability
Name : Technical personnel or technical units
Description : Tenderers can use the following technical personnel or technical units , particularly those who are responsible for quality control: For technical personnel or technical units that do not directly belong to the tenderer ́s business, but if the capacity the tenderer will use, cf. part II, section C, separate ESPD forms shall be supplemented.
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : For public building and construction work, technical personnel or units that shall carry out the work
Description : Tenderers can use the following technical personnel or technical units for public building and construction work to fulfil the contract:
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Technical facilities and quality assurance measures
Description : The tenderer utilises the following technical facilities and quality assurance measures and the tenderer ́s survey and research facility is as follows:
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Investigation and research facilities
Description : The tenderer ́s survey and research facilitates are as follows:
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Management and tracing of the supply chain
Description : The tenderer will be able to use the following management of the supply chain and tracing systems for the execution of the contract:
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Control Permission
Description : For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow checks of the tenderer's production capacity or technical capacity and, where necessary, of the survey and research facilities that the tenderer has at its disposal and of quality control measures? The inspections shall be undertaken by the contracting authority or the contracting authority can leave it to a competent public body in the country where the tenderer is established.
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Education and professional qualifications
Description : The following education and professional qualifications are possessed by the tenderer and/or (depending on the requirements set in the notice or in the procurement documents) of the leading employees: Minimum qualification requirements Requirement: The offered key personnel shall, as a minimum, have good competence for the execution of the contract. Key personnel means project manager and site manager/construction site manager. The project manager shall, as a minimum, be an engineer (BSc) within the relevant discipline as well as at least ten years experience from the building and construction industry. At least 5 years of these years must be able to be related to project management within equivalent projects. The site manager/construction site manager shall as a minimum have technical vocational college within the relevant discipline as well as at least ten years experience from the building and construction industry. At least 5 years of these years must be able to be related to site management/construction site management within equivalent projects. Middle management school or facility manager school will also be seen as relevant education on equal terms with technical vocational college. Equivalent projects means projects that involve water, sewage and roads that involve construction in challenging terrain with sheet piling works, deep ditches, the establishment of large pipelines (D>1200 mm), handling surface water, road works and traffic changes. Documentation: Tenderers shall present an overview of key roles for the assignment. Individual CVs shall be enclosed for each offered key personnel. Minimum 3 relevant reference projects from the last 5 years must be given, in which the offered personnel have had an equivalent role. It is not necessary to provide information on other concrete persons in the project organisation, and only one concrete person shall be offered in each of the roles. The contracting authority has prepared a form that the tenderer shall use to reply to this qualification requirement. See annex 1.4.
Use of this criterion : Used
Criterion :
Type : Technical and professional ability
Name : Environmental management measures
Description : Tenderers can employ the following environmental management measures in connection with the execution of the contract:
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Number of employees in the management
Description : The tenderer ́s number of employees in the management during the last three years was as follows:
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Average workforce
Description : The tenderer's average annual workforce in the last three years has been as follows:
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Tools, materials and technical equipment.
Description : Tenderers can use the following tools, material and technical equipment to carry out the contract:
Use of this criterion : Not used
Criterion :
Type : Technical and professional ability
Name : Portion of the contract to sub-suppliers.
Description : The tenderer is considering to outsource the following part (as a percentage) of the contract to sub-suppliers. Note that if the tenderer has decided to outsource a part of the contract to sub-suppliers and will use the sub-suppliers ́ capacity to carry out this part, a special ESPD will be supplemented for such sub-suppliers, see part II, section C, above.
Use of this criterion : Not used

5.1.10 Award criteria

Criterion :
Type : Quality
Name : Price
Description :
Weight (points, exact) : 10
Description of the method to be used if weighting cannot be expressed by criteria :
Justification for not indicating the weighting of the award criteria :

5.1.11 Procurement documents

Languages in which the procurement documents are officially available : Norwegian
Deadline for requesting additional information : 11/12/2024 11:00 +00:00
Address of the procurement documents : https://permalink.mercell.com/224160364.aspx

5.1.12 Terms of procurement

Terms of submission :
Electronic submission : Required
Languages in which tenders or requests to participate may be submitted : Norwegian
Electronic catalogue : Not allowed
Advanced or qualified electronic signature or seal (as defined in Regulation (EU) No 910/2014) is required
Variants : Not allowed
Deadline for receipt of tenders : 08/01/2025 11:00 +00:00
Deadline until which the tender must remain valid : 3 Month
Information about public opening :
Opening date : 08/01/2025 11:00 +00:00
Terms of contract :
The execution of the contract must be performed within the framework of sheltered employment programmes : No
Electronic invoicing : Required
Electronic ordering will be used : no
Electronic payment will be used : yes

5.1.15 Techniques

Framework agreement :
No framework agreement
Information about the dynamic purchasing system :
No dynamic purchase system
Electronic auction : no

5.1.16 Further information, mediation and review

Review organisation : Sør-Rogaland Tingrett
Organisation providing additional information about the procurement procedure : Stavanger kommune
Organisation providing offline access to the procurement documents : Stavanger kommune
Organisation providing more information on the review procedures : Stavanger kommune
Organisation receiving requests to participate : Stavanger kommune
Organisation processing tenders : Stavanger kommune

8. Organisations

8.1 ORG-0001

Official name : Stavanger kommune
Registration number : 964965226
Postal address : Postboks 8001
Town : STAVANGER
Postcode : 4068
Country subdivision (NUTS) : Rogaland ( NO0A1 )
Country : Norway
Contact point : Vanessa Venema
Telephone : +47 51507090
Roles of this organisation :
Buyer
Organisation providing additional information about the procurement procedure
Organisation providing offline access to the procurement documents
Organisation receiving requests to participate
Organisation processing tenders
Organisation providing more information on the review procedures

8.1 ORG-0002

Official name : Sør-Rogaland Tingrett
Registration number : Sør-Rogaland tingrett
Town : Stavanger
Postcode : 4001
Country : Norway
Telephone : 52 00 46 00
Roles of this organisation :
Review organisation

10. Change

Version of the previous notice to be changed : 0acae166-daf1-4729-8cd1-a4f98ad7f6e2-01

10.1 Change

Section identifier : PROCEDURE

10.1 Change

Section identifier : LOT-0000

11. Notice information

11.1 Notice information

Notice identifier/version : fd049975-1b72-4050-a1af-05d9dc730498 - 01
Form type : Competition
Notice type : Contract or concession notice – standard regime
Notice dispatch date : 26/11/2024 09:01 +00:00
Notice dispatch date (eSender) : 26/11/2024 09:14 +00:00
Languages in which this notice is officially available : English

11.2 Publication information

Notice publication number : 00722430-2024
OJ S issue number : 231/2024
Publication date : 27/11/2024