This contract includes the following elements: 1.Sewerage network Construction of sewerage network in approximate length of 9.2 km. 2. Water supply priority measures Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. 3. Wastewater Treatment Plant Design and Construction …
The indicative scope of works covers the following elements: 1. Sewerage network: - Phase I: Construction of the main collector, pumping station for transfer of collected wastewater from the urban area and connections of II and III phase. - Phases II and III: Construction of wastewater network with total length …
This contract includes the following elements: 1. Sewerage network Construction of sewerage network in the approximate length of 9.2 km. 2. Water supply priority measures Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. 3. Wastewater Treatment Plant Design …
The contract includes the following elements: 1.Sewerage network: Phase I: Construction of the main collector, pumping station for transfer of collected wastewater from the urban area and connections of II and III phase. Phases II and III: Construction of wastewater network with total length of L=13,793 m. 2. Wastewater Treatment …