This is a 25km long 24kV cable laying around Vatnsnes west from Hjallholt to Saurbær and Þorgrímsstaðardal, along with the installation of 9 substations and one switch station, laying about 1,200m of 1kV local cable. Estimated work period is July 8 to August 30, 2024. This is a 25km long …
Cable laying from Fiskilæk to Höfn together with soil replacement for earth transformer stations. High-voltage cable is 3x95q 12 kV about 7.8 km, low-voltage cables about 455 m, ground wire about 500 m or about 8.8 km in total. 5 substations are expected in this project. It is planned to …
This is the laying of 7.2 km of high-voltage cable along with the installation of four substations. Also junction boxes, connection holes, earth electrode and other things that are needed for the work as well as finishing. This is the laying of 7.2 km of high-voltage cable along with the …
It is a construction of 20.1 km high voltage cable along with the installation of nine substations. Also junction boxes, connection holes, earth electrode and other things needed for the work as well as finishing. The work will begin on July 10 and shall be completed on August 20 It …
There are two workplaces, i.e. cable ploughing from Fíflholti to Akrar and from Melur to Hítardalur along with soil exchange for earth transformer stations. High-voltage cables are 3x25q 24 kV about 28.3 km, low-voltage cables about 960 m, ground wire about 1,200 m or about 30.3 km in total. 11 …
The work consists of the renewal of three sections of the distribution system in Suðursveit from Smyrlabjargaraarvirkjun to Reynivellir. It is planned to start the work in June and to finish it in August. The work consists of the renewal of three sections of the distribution system in Suðursveit from …
Plowing of underground cables from Skriðuseli in Víðivelli and from Þingmúla in Hauga, together with the installation of transformer stations and cabinets. The work will be carried out between June 18 and September 30, 2024. Plowing of underground cables from Skriðuseli in Víðivelli and from Þingmúla in Hauga, together with …
Jedná se o traťový úsek Střelice (mimo) - Zastávka u Brna (včetně), který je součástí celostátní dráhy Brno - Jihlava a tvoří neelektrizovanou spojnici, mezi těmito stanicemi. Stavba bude řešit vlastní elektrizaci trati včetně předelektrizačních úprav. Trať bude elektrizována střídavou jednofázovou soustavou 25kV, 50 Hz. V rámci stavby bude trať …
Dynamický nákupný systém bude slúžiť na zadávanie zákaziek na uskutočnenie bežne dostupných stavebných prác v rámci zabezpečenia rutinnej štandardnej údržby na pozemných stavbách v pôsobnosti Akadémie ozbrojených síl a s nimi súvisiacich služieb (ako napr. likvidácia spotrebného materiálu, odpadu a nebezpečného odpadu v súlade so zákonom č. 79/2015 Z. z. …
This is the laying of 14.2 km of high-voltage cable together with the installation of three substations. Also junction boxes, connection holes, earth electrode as well as finishing. This is the laying of 14.2 km of high-voltage cable together with the installation of three substations. Also junction boxes, connection holes, …